650-Mile 2007 Amgen Tour of California Route Announced

News & Results

12/6/2006| 0 comments
by Thomas Valentinsen
2007 Tour of California route
2007 Tour of California route

650-Mile 2007 Amgen Tour of California Route Announced

Coverage of the first U.S. professional cycling race of the season will air on television.

east to Santa Rosa, the 2007 route will continue north to Bodega Bay and turn onto Coleman Valley Road, a landmark climb in Northern California. Then, spectators can watch the stage win unfold as the field heads downhill from Occidental for three finishing circuit laps in downtown Santa Rosa. In 2006, Santa Rosa set the mark for one of the most enthusiastic and largest crowds of the entire Amgen Tour of California .

Stage 2: Santa Rosa to Sacramento (Tuesday, Feb. 20)
A scenic start through several Sonoma County wineries will quickly turn into one of the most significant climbs of the race as the peloton heads east en route to Sacramento. Twelve miles from the start, Trinity Road's vertical climbs and treacherous decent into the wineries of Napa Valley will make it one of the most difficult climbs of the entire race. Continuing east past Lake Berryessa, the peloton will head through Davis, recently named the best cycling town in the U.S. by Bicycle Magazine . With a quick turn to the north, the route will follow the Sacramento River to the well-known Tower Bridge and on to the Capitol Mall. The stage concludes with three circuits through downtown, finishing on the front step of California's Capitol Building, a perfect viewing location.


Stage 3: Stockton to San Jose (Wednesday, Feb. 21)
After a neutral start with parade laps through Stockton's revitalized downtown area, the peloton will head west through California's farm lands. After passing through Tracy, the riders will encounter a climb new to this year's race, Patterson Pass. After passing through the city of Livermore, The route then connects to the familiar roads of the 2006 Stage 2 route on Calaveras Road. This long, constant grade leads to the most difficult climb of the race, the Category One (highest ranked in order of difficulty) Sierra Road climb in San Jose. After completing this KOM (King of the Mountain) competition, the peloton will finish the 94.6-mile course in front of San Jose City Hall.

Stage 4: Seaside to San Luis Obispo (Thursday, Feb. 22 )
The remarkable views of stage four will make it a favorite for riders and spectators alike. Beginning in Seaside with a short neutral lap and traveling along a similar route to last year's Stage 4, the peloton will head south on scenic Highway 1 where the mountains and redwood forests flank the Pacific Ocean. At more than 130 miles and with three KOMs, this is the longest stage of the race and will test the riders on consistently hilly and technical terrain. The six-hour day will take the riders through Big Sur and by Hearst Castle before shifting inland toward the finish at the intersection of Osos and Monterey in San Luis Obispo.

Stage 5: Solvang Individual Time Trial (Friday, Feb. 23 )
The quaint Danish village of Solvang hosts some of the ProTour teams for training camps as well as some of the largest cycling events in the U.S. At only 14.5-miles, and with the start and finish located only two blocks apart, Stage 5

Your comments
Your comments
sign up or login to post a comment